Construction site with structural steel assemblies
Industry 03

Construction

Supply that arrives in the order the site can build it.

Industry Overview

Fabricated structures and hardware for contractors working to fixed programmes and issued drawing sets.

On a construction programme, a component that is technically correct but arrives in the wrong sequence still costs the same as one that is wrong. Buildability and delivery order are part of the specification, whether or not they were written down.

Sector Challenges

What makes this sector demanding.

  • Fixed programmes with limited float for rework
  • Drawing revisions arriving mid-production
  • Multiple vendors supplying interfacing components
  • Site storage and handling constraints
Our Approach

How we respond.

  • Delivery planned against the installation sequence
  • Match-marked and bundled supply to reduce site sorting
  • Interface components dimensioned from one drawing set
  • A single technical contact through the supply programme
Sector Enquiry

Supplying into construction?

Send us the specification and the conditions. We will engineer to them.